Subscribe Now
Trending News

DLF2

Preparation for the Oncoming Rains by RWA

As the rainy season approaches, residents of DLF Phase 2 are gearing up for the challenges that come with heavy downpours. Recognizing the importance of preparedness, the Resident Welfare Association of DLF2 has taken proactive measures to ensure a smooth transition into the rainy season.

RWA of DLF2 has requested the DLF/ DHBVN to do the following in the upcoming month keeping in mind the onset of Rains in the near future;

  1. Clear all drains.
  2. Clear rainwater harvesting pits of all the SILT.
  3. Prune all those tree branches which are close to high-tension wires overhead.
  4. Get all the electric meters, hanging on the poles outside the houses fixed properly.
    In addition, the RWA has procured Insulation tapes for them and has requested them to insulate all open-ended wires of the meters also.
Home
Neighbourhood
Comments